Project Overview
Replaced a 40-year-old 100-amp Federal Pacific panel with a new 200-amp Square D load center. Upgraded the meter base and service entrance cable, coordinated with Duke Energy for disconnect and reconnect. All circuits tested and labeled.
Project Photos
Project Specifications
- Federal Pacific panel removal
- 200A Square D panel installation
- Meter base and SE cable upgrade
- Full circuit testing and labeling
Project Type
Residential
Location
Campbellsburg, IN
Need Similar Service?
Contact us today for a free consultation and quote for your project.

